(peculiar) Spec Electronics/aircraft/(e2c) Parts

End item NSN parts
Filter By: Electrical Cable Assembly Sets
page 1 of 1
Part Number
NSN
NIIN
123SAV54050-1 Electrical Cable Assembly Set
010202752
20C3338-1 Electrical Cable Assembly Set
003010528
20C3340-1 Electrical Cable Assembly Set
003001748
20C3341-1 Electrical Cable Assembly Set
003010527
20C3345-1 Electrical Cable Assembly Set
003010523
20C3347-1 Electrical Cable Assembly Set
003010516
20C3349-1 Electrical Cable Assembly Set
003010514
20C3350-1 Electrical Cable Assembly Set
003001727
20C3545-1 Electrical Cable Assembly Set
003001751
20C3546-1 Electrical Cable Assembly Set
003010528
20C3547-1 Electrical Cable Assembly Set
003001749
Page:

(peculiar) Spec Electronics/aircraft/(e2c)

Picture of (peculiar) Spec Electronics/aircraft/(e2c)

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections. The Project Management Body of Knowledge (PMBOK 5) defines the work breakdown structure as a "A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables."

A work breakdown structure element may be a product, data, service, or any combination thereof. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

WBS is a hierarchical and incremental decomposition of the project into phases, deliverables and work packages. It is a tree structure, which shows a subdivision of effort required to achieve an objective; for example a program, project, and contract. In a project or contract, the WBS is developed by starting with the end objective and successively subdividing it into manageable components in terms of size, duration, and responsibility (e.g., systems, subsystems, components, tasks, subtasks, and work packages) which include all steps necessary to achieve the objective.

Jetzt vergleichen»
Klar | Verstecken