(peculiar) Spec Electronics/aircraft/(e2c) Parts

End item NSN parts
Filter By: Indicator Light Assemblys
page 1 of 1
Part Number
NSN
NIIN
123SCAV5268-17 Indicator Light Assembly
013140564
123SCAV5782-1 Indicator Light Assembly
011387962
123SCAV5782-9 Indicator Light Assembly
013174395
702870-17 Indicator Light Assembly
013140564
75-0390-1 Indicator Light Assembly
011387962
75-0390-13 Indicator Light Assembly
013174395
Page:

(peculiar) Spec Electronics/aircraft/(e2c)

Picture of (peculiar) Spec Electronics/aircraft/(e2c)

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections. The Project Management Body of Knowledge (PMBOK 5) defines the work breakdown structure as a "A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables."

A work breakdown structure element may be a product, data, service, or any combination thereof. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

WBS is a hierarchical and incremental decomposition of the project into phases, deliverables and work packages. It is a tree structure, which shows a subdivision of effort required to achieve an objective; for example a program, project, and contract. In a project or contract, the WBS is developed by starting with the end objective and successively subdividing it into manageable components in terms of size, duration, and responsibility (e.g., systems, subsystems, components, tasks, subtasks, and work packages) which include all steps necessary to achieve the objective.

Jetzt vergleichen»
Klar | Verstecken