Submarine Hydraulic Systems Parts

End item NSN parts
Filter By: Machine Thread Plugs
page 1 of 1
Part Number
NSN
NIIN
02-000009 Machine Thread Plug
010986857
02-000010 Machine Thread Plug
011779675
02-0001-44 Machine Thread Plug
012919473
20376-400 ITEM 10 Machine Thread Plug
011779675
20612 FIND 22 Machine Thread Plug
012919473
3-378-2-01-901-08 Machine Thread Plug
011179801
8WX2401-8 Machine Thread Plug
011179801
Page:

Submarine Hydraulic Systems

Picture of Submarine Hydraulic Systems

К-3 was a project 627 "Кит" (kit, meaning "whale"; NATO reporting name "November") submarine of the Soviet Navy's Northern Fleet, the first nuclear submarine of the Soviet Union. The vessel was prototyped in wood, with each of five segments scattered between five different locations about Leningrad, including the Astoria Hotel.

On June 17, 1962, by this time under the command of Zhiltsov, К-3 reached the North Pole underwater, the first among Soviet submarines (a feat was performed nearly four years earlier by USS Nautilus). The submarine also surfaced on the Pole (a feat performed 3 years before by USS Skate). For this voyage, she was awarded the name Leninskiy Komsomol (Ленинский Комсомол) on October 9, 1962, and her crew, rather than training in military operations, began taking part in many congresses and conferences. This idle life continued until the summer of 1967 when a boat that had been scheduled for patrol in the Mediterranean Sea was unavailable. К-3 was tasked with that patrol. She was assigned a new commander, Captain Second Rank Stepanov, and her executive officer arrived aboard only two hours before she put to sea. Whatever the initial material condition of the boat, the crew was not ready for sea. By the time they reached the Mediterranean, the air regeneration system had failed and the temperature on board was 35–40 °C (95–104 °F).

Jetzt vergleichen»
Klar | Verstecken