Teilenummer
Entmilitarisierung
Lagerfähigkeit
UOM
NIIN
NSN
Nationale Bestandsnummer:
TXT
Beschreibung:
Steam Op Water Distillation Unit
MRC:
The dimension measured along the longitudinal axis with terminated points at the extreme ends of the item.ABHP
Overall Length:
7.542 feet
MRC:
The distance measured in a straight line from the bottom to the top of an item.ABKW
Overall Height:
5.677 feet
MRC:
An overall measurement taken at right angles to the length of an item,in distinction from thickness.ABMK
Overall Width:
5.490 feet
MRC:
The amount of purified water the item is capable of producing for a given period of time.APZM
Potable Water Capacity:
125.0 gallons per hour
MRC:
The number of effects contained within the item.AQAA
Err Default:
Err default
MRC:
The number of effects contained within the item.AQAA
Effect Quantity:
2
MRC:
The number of shells provided.AQAB
Err Default:
Err default
MRC:
The number of shells provided.AQAB
Shell Quantity:
1
MRC:
Indicates the type of surface where the evaporation process takes place.AQAC
Err Default:
Err default
MRC:
Indicates the type of surface where the evaporation process takes place.AQAC
Evaporation Surface Type:
Submerged tube
MRC:
The physical configuration of the evaporation surface.AQAD
Err Default:
Err default
MRC:
The physical configuration of the evaporation surface.AQAD
Evaporation Surface Shape:
Straight
MRC:
The required operating steam pressure of the first effect,expressed in pounds per square inch.AQAE
Err Default:
Err default
MRC:
The required operating steam pressure of the first effect,expressed in pounds per square inch.AQAE
First Effect Operating Steam Pressure In Psi:
5.0
MRC:
The required operating steam pressure of the air ejector,expressed in pounds per square inch.AQAF
Err Default:
Err default
MRC:
The required operating steam pressure of the air ejector,expressed in pounds per square inch.AQAF
Air Ejector Operating Steam Pressure In Psi:
80.0
MRC:
The minimum space or distance from one item to another item required to facilitate removal of the tube/s/.AQAJ
Err Default:
Err default
MRC:
The minimum space or distance from one item to another item required to facilitate removal of the tube/s/.AQAJ
Tube Removal Minimum Distance:
5.500 feet
MRC:
Indicates the location from which the tube/s/ is removed from the unit.AQAK
Err Default:
Err default
MRC:
Indicates the location from which the tube/s/ is removed from the unit.AQAK
Tube Removal Location:
Front
MRC:
A feature of the item of supply which must be specifically recorded when the reference number covers a range of items.ZZZY
Reference Number Differentiating Characteristics:
As differentiated by first effect operating steam pressure in psi, air ejector operating steam pressure in psi, length, width, height